The STRATA residence seen from the lake at blue hour

01 · On the lake

Four hundred metres from your door.

Seven residences directly on the lake, with a private jetty and steps into the water.

02 · The house

Four floors. Seven residences.

Two residences per floor, each open to the lake along its full width. The top floor belongs to the penthouse.

  • 2.5 – 6.5 rooms
  • 92 – 310 m²
  • Minergie-P

03 · Stone and glass

Limestone, bronze and glass.

Honed Jura limestone inside and out, bronze window frames, floor-to-ceiling glass towards the water.

04 · Your window

One window is already waiting.

Residence C.21 on the second floor: 5.5 rooms, a fireplace and a 44 m² terrace.

05 · The terrace

A terrace for every residence.

From 24 m² to 140 m² on the top floor, all facing the lake.

06 · Home

And then you are home.

C.21 is still available. Completion autumn 2028.

See all residences

STRATA · Residences am See

STRATA builds one house at a time. This one has seven residences, its own shore and a view no one can build over. We are happy to show you the plans and the materials in person.

0residences
0floors
0to Zurich main station
0already reserved
Corner of the residence: stacked limestone slabs and bronze-framed glass at blue hour
South-west corner, blue hour

Architecture

Horizontal slabs of honed limestone, like the strata of a lakeshore.

Each floor is a limestone slab that reaches past the glass. In summer it shades the rooms, in winter the low sun comes deep inside. Frames and railings are bronze and never need paint.

Minergie-P
Certified standard
Geothermal
Heating and cooling
3.2 m
Ceilings on the top floor

Residences

Choose a floor on the house. Every residence faces the lake.

The residence seen from the lake, four floors

Prices on request. After a short call we send dimensioned plans and the building description.

Location

On the shore, close to Zurich.

  • Private jetty and lake stepsat the house
  • Village centre and bakery4 min walk
  • Zurich main station22 min S-Bahn
  • Zurich Airport28 min car
Limestone steps leading into the lake, a folded towel on the top step
Stone path through the garden with lavender, leading to the lake

Construction progress

Built in the open.

Construction started in April 2026. This month we are building the basement and the lake wall.

03 · 2025

Building permit granted

04 · 2026

Groundbreaking

10 · 2026

Basement and lake wall

We are here
12 · 2027

Shell completed

09 · 2028

Keys handed over

Private viewing.

In our studio we show you the 1:50 model, the floor plans and the original materials. One hour with the architect, with no obligation.

Choose a day and time